Curb & Gutter Installation

A. Lamp will begin excavating for curb and gutter on Friday (July 13) or Monday (July 16). They will complete one side of each street before beginning the other side. They will start with the North side of Greenview and the East side of Briar. Residents on those sides are asked to park on the other side of the street. Police should be notified of vehicle information, and cars will be allowed to park on the street overnight.

Order of Operations for Curb and Gutter (C&G):
  • Excavate area for C&G
  • Driveways temporarily ramped with stone until concrete is poured
  • Pour concrete
  • 3 days (72 hours) of cure time required before cars will be allowed to drive onto driveway